TCEQ RG-639 SWPPP template explained (2026)

RG-639 is TCEQ's free 72-page SWP3 template. You fill in every section for your site.

Check your site free

Free. No account, no email.

Key takeaways

What is in RG-639?

SectionWhat it holds
Shared signature pageEach operator in a shared plan signs
General site informationWho and where
Sequence of gradingThe order of soil-disturbing work
Acreage and soilAcres of the property and of construction; soil data
Site mapsThe general location map and detailed site maps
Support activitiesStaging, borrow, batch plants
Authorization documentsThe notice or NOI
BMP list and sediment basin sheetYour controls and basin sizing
Allowable non-stormwater listThe discharges the permit allows
Inspection personnelWho inspects
Dewatering worksheetsDaily observation records
Inspection plans and adverse conditions logSchedule and suspensions

What do I still have to do myself?

You pick the controls and the schedule, draw or attach the site maps, and look up your receiving water and your storm sewer operator.

You fill in and sign the plan. The permit requires a SWP3 that is developed and implemented before work starts.

How does RG-639 relate to the permit?

The permit lists what a SWP3 must contain in Part III.F: site description, site map items, controls and timing, maintenance, dewatering, inspections. RG-639 is TCEQ's template for it.

We read RG-639's headings and its inspection and certification pages, not all 72 pages.

What does ReadySWPPP add?

ReadySWPPP builds the plan from the permit and your site's facts, and checks it against every requirement. See how we check every plan and the sample plan.

FAQ

Is RG-639 free?

Yes. TCEQ publishes it as a download.

Is RG-639 required?

The permit requires a SWP3 with the Part III.F elements. RG-639 is TCEQ's template for writing one.

Where do I get it?

From TCEQ: RG-639 (PDF).

Facts and sources

Last updated: