Do you need a stormwater plan in Texas?

Find out in one minute, free. If you do, ReadySWPPP builds your plan from TCEQ's permit.

Check your site free

Free. No account, no email.

Key takeaways

What ReadySWPPP is

ReadySWPPP builds Texas construction stormwater plans (SWPPP, called a SWP3 in the permit) from TCEQ's 2023 construction general permit, TXR150000, and runs the inspections from a phone.

You prepare and sign the plan. ReadySWPPP builds it from the permit and checks it against every requirement.

Three steps

  1. Check your site. Free, about a minute, no account. You get a yes or no and a dated to-do list.
  2. Build your plan. 30 to 45 minutes on a phone. $299 for a small site, $499 for a large site.
  3. Keep inspections on track. Rain alerts, a 5-minute checklist on your phone and signed reports, for $49 a month per site.

Read first

Last updated: