Free Texas construction site notice

Get the right TCEQ site notice for your site, filled in, free.

Make your free site notice

Free. No account, no email.

Key takeaways

Which TCEQ notice do I need?

Your siteForm
Small, 1 to under 5 acres20963
Small, in a low-erosion window20964
Large, primary operator20961
Large, secondary operator20962

What do I fill in?

A small-site notice asks for the operator, contact and phone, the project description and location, the start date, the end or stabilization date, where the SWP3 is kept, a signed certification, when the storm sewer operator was notified, and the removal date.

What happens after I post it?

Send a signed copy to the operator of the storm sewer system that receives your runoff. At the end, fill in the removal part and send the completed notice within 30 days.

Read posting rules.

FAQ

Is the notice the same as the SWPPP?

No. The notice is a one-page form. The SWP3 is the written plan, and the notice goes in it.

Do I send it to TCEQ?

A small site does not file an NOI and sends the notice to the storm sewer operator, not to TCEQ.

Facts and sources

Last updated: